Time Without Optimization. This is the total time it
would take to produce all pieces at the standard cycle
time without any optimization or parallel processing.
Calculated as (Cycle Time × Number of Pieces).
1h 23m 20s
Actual Time:
i
Actual Production Time
The actual elapsed time from start to finish of
production, based on your input of actual end time. This
reflects real-world conditions including all
efficiencies and inefficiencies.
1h 20m 55s
Effective CT:
i
Effective Cycle Time
The average time taken to produce each piece based on
actual production time. Calculated as (Actual Production
Time ÷ Number of Pieces). Lower is better and indicates
higher efficiency.
9.71s per piece
Efficiency:
i
Efficiency Improvement
The percentage reduction in total production time
compared to the standard cycle time. Calculated as
((Time Without Optimization - Actual Production Time) ÷
Time Without Optimization × 100%). Higher percentages
indicate greater efficiency gains.
2.9%
Prod. Rate:
i
Production Rate
The average number of pieces produced per minute during
the actual production run. Calculated as (Number of
Pieces ÷ Actual Production Time in minutes). Higher
values indicate faster production.